FAQ
Frequently asked
Where is Phase 2 of The Atlas?
At 23 Tung Yuen Street, Yau Tong (a provisional number to be confirmed on completion), by the Yau Tong waterfront. The developer puts MTR Yau Tong about a 6-minute walk away.
How many homes are in Phase 2?
617 in total: 324 in Tower 1 and 293 in Tower 2. Residential floors run from 2/F to 32/F, with no 4/F, 13/F, 14/F or 24/F.
What layouts and sizes are there?
Per promotional material: 338 one-beds with open kitchens (281–342 sq ft); 52 two-beds with open kitchens (429–478); 52 two-beds with Flexi-kit kitchens (497–503); 104 two-beds with enclosed kitchens (461–510); 50 three-beds with a work room and WC (714–721); and 21 special units (242–721). All saleable areas.
What are the special units?
The 19 flats on 2/F with a flat roof (12 in Tower 1, 7 in Tower 2), of about 61–316 sq ft, plus 32/F Flats B and M in Tower 1 with roofs of about 380 and 397 sq ft. Saleable areas of 242–721 sq ft; flat roofs and roofs are not included.
What is the three-in-one balcony?
On typical floors the balcony (about 22–24 sq ft), utility platform (16 sq ft) and A/C platform sit together — the "three-in-one balcony". Balcony and utility platform are included in the saleable area; the 2/F special units have a flat roof instead.
How high are the ceilings?
Promotional material gives 3.15 m for typical floors. The sales brochure lists floor-to-floor heights of about 2.8–3.2 m on typical floors depending on the part of the flat; this includes the slab.
Which kitchen appliances are included?
Per the sales brochure, kitchens have a Miele induction hob, telescopic hood, built-in microwave and fridge-freezer, with a Miele gas hob and steam combi-oven in some flats, and a Gaggenau washer-dryer. Air-conditioning is Daikin and bathrooms have Panasonic thermo ventilators. Details differ between flats; subject to the sales brochure.
Any thoughtful details?
Typical flats have the three-in-one balcony, baffle-type acoustic windows and balconies, Daikin VRV air-conditioning and bathroom thermo ventilators; promotional material also stresses square layouts with no corridors.
What about the harbour and the waterfront?
The development is by the Yau Tong waterfront and promotional material features harbour views. Actual views depend on orientation, floor and surroundings, and construction of later phases may affect them; visit the site to see for yourself.
How easy is it to reach Hong Kong Island?
From Yau Tong the Tseung Kwan O Line reaches Quarry Bay in one stop and North Point in two, for the Island Line to Causeway Bay, Admiralty and Central. The developer puts the station about a 6-minute walk away. For reference only.
Any other transport?
Media reports mention a ferry to Sai Wan Ho and more than 160 bus and minibus routes across Hong Kong and to the airport. Schedules and routes follow the operators and the Transport Department.
Where can I drive to easily?
The Eastern Harbour Crossing and the Tseung Kwan O–Lam Tin Tunnel are close by for Hong Kong Island East or Tseung Kwan O, and the Kwun Tong Bypass leads to Kowloon East and Kai Tak. Times depend on traffic.
Which school net is it in?
Promotional material places it in Primary School Net 48 and the Kwun Tong secondary net. Net 48 includes Yau Tong schools such as St Antonius, CCC Kei Faat (Yau Tong) and SKH Yautong Kei Hin. School nets follow the Education Bureau.
Is there parking?
The sales brochure shows no parking within Phase 2 itself; promotional material lists 212 residential spaces shared by the 3 phases.
What is in the clubhouse?
Media reports put CLUB ATLAS and its gardens at over 83,000 sq ft with about 30 facilities; the layout plan shows an outdoor pool, BBQ area, children's play area and recreational facilities, and promotional material shows a 24-hour footbridge linking the two clubhouses. Some facilities may charge fees.
When will it be completed?
Per the sales brochure, Phase 2 is uncompleted, with an estimated material date of 30 December 2028, subject to any extension permitted under the agreement for sale and purchase.
Who will manage it?
Under the latest draft deed of mutual covenant, the manager will be Yue Xiu Property Management Limited.
Who is the developer?
Per the sales brochure, the vendor is Charm Smart Development Limited, whose holding companies include Yuexiu Property (HK) Company Limited, Dragon Yield Holding Limited and Yuexiu Property Company Limited.
What was on the site before?
Media reports say the site was a Yuexiu cold store; the whole development has 3 phases and 5 towers with 1,339 homes.
Are the images actual photos?
Renderings are artists' impressions, not photos. The harbour photos are for reference only and do not show the view from any particular flat. Plans come from the sales brochure and promotional material. All for reference only.
How can I find out more?
Tap the WhatsApp button or scan the WeChat QR code. Tell us how many bedrooms you need and which tower you like, and we will reply soon.
Enquiry
Interested? WhatsApp us
Tell us how many bedrooms you need and which tower you like, and we will reply soon.